Townshend Dam, West River

Townshend Dam, West River
 Drainage Area: 278 sq. miles 
 Channel Capacity: 9,000 cfs 
 Storage at Spillway Crest: 5.81 in / 32,900 ac-ft  
 Normal Pool: 21 Feet 
 Gate Settings for March 08, 2021 07:00 am Gate 1 Gate 2 Gate 3 Hydro Pos. Gate 5 Gate 6 Gate 7 Gate 8
  9.9 0.0 9.9 1        
Date (EST) Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Air Temp
(F)
Mar-08 08:45 am 23.24 1.1 280 3.51 233 224 22.12  
Mar-08 07:45 am 23.26 1.1 283 3.52 236 233 22.12 15.9
Mar-08 06:45 am 23.27 1.1 284 3.52 236 242 22.12 11.8
Mar-08 05:45 am 23.28 1.1 285 3.52 236 252 22.12 13.0
Mar-08 04:45 am 23.29 1.1 286 3.51 233 267 22.12 15.1
Mar-08 03:45 am 23.29 1.1 286 3.51 233 262 22.12 17.2
Mar-08 02:45 am 23.28 1.1 285 3.50 230 256 22.12 17.2
Mar-08 01:45 am 23.26 1.1 283 3.50 230 251 22.12 19.3
Mar-08 12:45 am 23.23 1.1 279 3.50 230 239 22.12 20.0
Mar-07 11:45 pm 23.20 1.1 275 3.51 233 232 22.12 19.3
Mar-07 10:45 pm 23.15 1.1 269 3.70 292 232 22.12 20.3
Mar-07 09:45 pm 23.21 1.1 276 3.70 292 254 22.12 22.2
Mar-07 08:45 pm 23.26 1.1 283 3.70 292 280 22.12 23.8
Mar-07 07:45 pm                
Mar-07 06:45 pm                
Mar-07 05:45 pm                
Mar-07 04:45 pm                
Mar-07 03:45 pm                
Mar-07 02:45 pm                
Mar-07 01:45 pm                
Mar-07 12:45 pm                
Mar-07 11:45 am                
Mar-07 10:45 am                
Mar-07 09:45 am                
Maximum 24 Hour Drawdown Rate (10 feet/day): 141 cfs + Inflow (224 cfs) = 365 cfs
Report Generated March 08, 2021 07:49 pm