Townshend Dam, West River | |||||||||
Drainage Area: | 278 sq. miles  | ||||||||
Channel Capacity: | 9,000 cfs | ||||||||
Storage at Spillway Crest: | 5.81 in / 32,900 ac-ft | ||||||||
Normal Pool: | 21 Feet | ||||||||
Gate Settings for March 08, 2021 07:00 am | Gate 1 | Gate 2 | Gate 3 | Hydro Pos. | Gate 5 | Gate 6 | Gate 7 | Gate 8 | |
9.9 | 0.0 | 9.9 | 1 |
Date (EST) | Pool (ft) |
Storage (%) |
Storage (ac-ft) |
Tailwater (ft) |
Flow (cfs) |
Inflow (cfs) |
Precip (in) |
Air Temp (F) |
Mar-08 08:45 am | 23.24 | 1.1 | 280 | 3.51 | 233 | 224 | 22.12 | |
Mar-08 07:45 am | 23.26 | 1.1 | 283 | 3.52 | 236 | 233 | 22.12 | 15.9 |
Mar-08 06:45 am | 23.27 | 1.1 | 284 | 3.52 | 236 | 242 | 22.12 | 11.8 |
Mar-08 05:45 am | 23.28 | 1.1 | 285 | 3.52 | 236 | 252 | 22.12 | 13.0 |
Mar-08 04:45 am | 23.29 | 1.1 | 286 | 3.51 | 233 | 267 | 22.12 | 15.1 |
Mar-08 03:45 am | 23.29 | 1.1 | 286 | 3.51 | 233 | 262 | 22.12 | 17.2 |
Mar-08 02:45 am | 23.28 | 1.1 | 285 | 3.50 | 230 | 256 | 22.12 | 17.2 |
Mar-08 01:45 am | 23.26 | 1.1 | 283 | 3.50 | 230 | 251 | 22.12 | 19.3 |
Mar-08 12:45 am | 23.23 | 1.1 | 279 | 3.50 | 230 | 239 | 22.12 | 20.0 |
Mar-07 11:45 pm | 23.20 | 1.1 | 275 | 3.51 | 233 | 232 | 22.12 | 19.3 |
Mar-07 10:45 pm | 23.15 | 1.1 | 269 | 3.70 | 292 | 232 | 22.12 | 20.3 |
Mar-07 09:45 pm | 23.21 | 1.1 | 276 | 3.70 | 292 | 254 | 22.12 | 22.2 |
Mar-07 08:45 pm | 23.26 | 1.1 | 283 | 3.70 | 292 | 280 | 22.12 | 23.8 |
Mar-07 07:45 pm | ||||||||
Mar-07 06:45 pm | ||||||||
Mar-07 05:45 pm | ||||||||
Mar-07 04:45 pm | ||||||||
Mar-07 03:45 pm | ||||||||
Mar-07 02:45 pm | ||||||||
Mar-07 01:45 pm | ||||||||
Mar-07 12:45 pm | ||||||||
Mar-07 11:45 am | ||||||||
Mar-07 10:45 am | ||||||||
Mar-07 09:45 am | ||||||||
Maximum 24 Hour Drawdown Rate (10 feet/day): 141 cfs + Inflow (224 cfs) = 365 cfs | ||||||||
Report Generated March 08, 2021 07:49 pm |