Corps Flood Control Release Schedule Last Updated: December 17, 2024 | ||||||
Corps Dam |
State |
Current Time |
Current Release |
New Release |
New Release Time |
Comments |
UPPER CONNECTICUT RIVER BASIN |
||||||
No significant changes anticipated at Corps projects. Where reservoir levels are still falling, outflow will generally lower correspondingly. | ||||||
LOWER CONNECTICUT RIVER BASIN |
||||||
No significant changes anticipated at Corps projects. Where reservoir levels are still falling, outflow will generally lower correspondingly. | ||||||
MERRIMACK RIVER BASIN |
||||||
No significant changes anticipated at Corps projects. Where reservoir levels are still falling, outflow will generally lower correspondingly. | ||||||
THAMES RIVER BASIN |
||||||
All Corps Dams will be making minor adjustments in flow to stabilize their pool levels from rising and/or maintain run-of-river operations. If more significant releases are warranted the release schedule will be updated. | ||||||
NAUGATUCK RIVER BASIN |
||||||
No significant changes anticipated at Corps projects. Where reservoir levels are still falling, outflow will generally lower correspondingly. | ||||||
BLACKSTONE RIVER BASIN |
||||||
No significant changes anticipated at Corps projects. Where reservoir levels are still falling, outflow will generally lower correspondingly. |