Corps Flood Control Release Schedule
Last Updated: December 17, 2024

Corps Dam

State
Current
Time
Current
Release
New
Release
New Release
Time
Comments
UPPER CONNECTICUT RIVER BASIN
No significant changes anticipated at Corps projects. Where reservoir levels are still falling, outflow will generally lower correspondingly.
LOWER CONNECTICUT RIVER BASIN
No significant changes anticipated at Corps projects. Where reservoir levels are still falling, outflow will generally lower correspondingly.
MERRIMACK RIVER BASIN
No significant changes anticipated at Corps projects. Where reservoir levels are still falling, outflow will generally lower correspondingly.
THAMES RIVER BASIN
All Corps Dams will be making minor adjustments in flow to stabilize their pool levels from rising and/or maintain run-of-river operations. If more significant releases are warranted the release schedule will be updated.
NAUGATUCK RIVER BASIN
No significant changes anticipated at Corps projects. Where reservoir levels are still falling, outflow will generally lower correspondingly.
BLACKSTONE RIVER BASIN
No significant changes anticipated at Corps projects. Where reservoir levels are still falling, outflow will generally lower correspondingly.