Cabinet after installation of new bubbler and digital I/O module (2/4/25) and DGH module to provide 0-5 V output to hydropower (3/20/25) 21 Apr 2025 Download
Cabinet after installation of new bubbler and digital I/O module (2/4/25) and DGH module to provide 0-5 V output to hydropower (3/20/25) 21 Apr 2025 Download
Upper pool well inlet photo. This phot is taken standing on the lower inlet cleanout manhole cover. My finger is in the picture for perspective. 20 Feb 2025 Download
dry dirt at the kink of conduit. High degree of confidence this is either at the kink or the coupler immediately above the kink. 20 Feb 2025 Download
dry dirt at the kink of conduit. High degree of confidence this is either at the kink or the coupler immediately above the kink. 20 Feb 2025 Download
non-frozen green slime found 36 ft from pull elbow in conduit. I think it is somewhere past the 3rd elbow and in the riprap. 20 Feb 2025 Download
Heat tape applied externally due to lack of access beyond the kink. 30 Jan 2025 Download
Conduit layout. Potential non-downward slope provides a place for water to pool within the orifice line 30 Jan 2025 Download
Conduit physical damage. Note frost behind the conduit. This was the only section that had frost behind the conduit at 1400 local, including other places which were in direct sunlight plus against the concrete. 30 Jan 2025 Download
Junction box cleanout. Had a lot of dirt. Has two drain holes in it. 30 Jan 2025 Download