Townshend Dam, West River

Townshend Dam, West River
 Drainage Area: 278 sq. miles 
 Channel Capacity: 9,000 cfs 
 Storage at Spillway Crest: 5.81 in / 32,900 ac-ft  
 Normal Pool: 21 Feet 
 Gate Settings for November 14, 2025 07:00 am Gate 1 Gate 2 Gate 3 Hydro Pos. Gate 5 Gate 6 Gate 7 Gate 8
  0.0 1.5 9.9 2        
Date Time
(Eastern)
Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Air Temp
(F)
Nov-17 07:30 am       5.48     6.29 31.3
Nov-17 06:30 am 23.58 1.0 323 5.50 857 853 6.29 30.8
Nov-17 05:30 am 23.63 1.0 329 5.51 866 895 6.29 30.5
Nov-17 04:30 am 23.68 1.0 335 5.59 940 937 6.29 31.7
Nov-17 03:30 am 23.80 1.1 350 5.59 940 993 6.29 31.7
Nov-17 02:30 am 23.83 1.1 354 5.63 978 1,011 6.29 32.9
Nov-17 01:30 am 23.89 1.1 361 5.64 988 1,040 6.29 31.7
Nov-17 12:30 am 23.92 1.1 365 5.66 1,008 1,071 6.29 31.4
Nov-16 11:30 pm 23.90 1.1 363 5.65 998 1,138 6.29 34.2
Nov-16 10:30 pm 23.83 1.1 354 5.65 998 1,145 6.29 34.7
Nov-16 09:30 pm 23.81 1.1 351 5.80 1,152 1,125 6.29 35.6
Nov-16 08:30 pm 23.93 1.1 366 5.86 1,217 1,160 6.29 36.6
Nov-16 07:30 pm 24.03 1.2 379 5.85 1,206 1,166 6.29 37.4
Nov-16 06:30 pm 24.07 1.2 384 5.82 1,173 1,148 6.29 38.1
Nov-16 05:30 pm 23.86 1.1 358 5.74 1,089 1,078 6.28 39.2
Nov-16 04:30 pm 23.84 1.1 355 5.76 1,109 1,046 6.28 39.4
Nov-16 03:30 pm 23.87 1.1 359 5.62 969 1,015 6.28 44.0
Nov-16 02:30 pm 23.69 1.0 336 5.63 978 933 6.28 44.4
Nov-16 01:30 pm 23.61 1.0 326 5.61 959 872 6.28 43.6
Nov-16 12:30 pm 23.56 1.0 320 5.55 903 840 6.28 44.3
Nov-16 11:30 am 23.46 1.0 308 5.44 804 779 6.28 45.2
Nov-16 10:30 am 23.37 0.9 296 5.43 796 715 6.28 47.8
Nov-16 09:30 am 23.35 0.9 294 5.30 692 644 6.28 49.0
Nov-16 08:30 am 23.31 0.9 289 5.22 638 570 6.28 49.0
Nov-16 07:30 am 23.21 0.9 276 5.06 542 494 6.28 42.4
Maximum 24 Hour Drawdown Rate (10 feet/day): 163 cfs + Inflow (853 cfs) = 1,016 cfs
Report Generated November 17, 2025 07:43 am