Edward MacDowell Dam, Nubanusit Brook

Edward Macdowell Dam, Nubanusit Brook
 Drainage Area: 44 sq. miles 
 Channel Capacity: 650 cfs 
 Storage at Spillway Crest: 5.45 in / 12,800 ac-ft  
 Normal Pool: 911.5 Feet NGVD 
 Gate Settings for June 20, 2025 06:00 am Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 Gate 6 Gate 7 Gate 8
  3.0 0.0 0.0          
Date Time
(Eastern)
Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Air Temp
(F)
Jun-20 10:15 pm 912.25 2.3 313 2.95 88 82 32.67 65.3
Jun-20 09:15 pm 912.25 2.3 313 2.95 88 80 32.67 66.7
Jun-20 08:15 pm 912.25 2.3 313 2.95 88 77 32.67 68.9
Jun-20 07:15 pm 912.26 2.3 314 2.94 87 81 32.67 70.7
Jun-20 06:15 pm 912.27 2.3 316 2.94 87 84 32.67 72.2
Jun-20 05:15 pm 912.27 2.3 316 2.96 90 79 32.67 72.9
Jun-20 04:15 pm 912.27 2.3 316 2.96 90 80 32.67 75.8
Jun-20 03:15 pm 912.28 2.3 317 2.97 91 89 32.67 75.0
Jun-20 02:15 pm 912.29 2.3 319 2.97 91 93 32.67 74.5
Jun-20 01:15 pm 912.29 2.3 319 2.98 92 87 32.67 73.7
Jun-20 12:15 pm 912.29 2.3 319 3.00 94 93 32.67 71.9
Jun-20 11:15 am 912.31 2.3 322 2.99 93 99 32.67 69.8
Jun-20 10:15 am 912.31 2.3 322 3.01 95 90 32.67 67.6
Jun-20 09:15 am 912.29 2.3 319 2.98 92 87 32.67 66.2
Jun-20 08:15 am 912.29 2.3 319 3.00 94 87 32.67 64.1
Jun-20 07:15 am 912.31 2.3 322 3.00 94 94 32.67 64.2
Jun-20 06:15 am 912.29 2.3 319 2.99 93 88 32.67 65.5
Jun-20 05:15 am 912.29 2.3 319 3.00 94 88 32.67 65.5
Jun-20 04:15 am 912.32 2.3 323 3.01 95 97 32.67 69.8
Jun-20 03:15 am 912.31 2.3 322 3.00 94 95 32.66 70.5
Jun-20 02:15 am 912.31 2.3 322 3.00 94 95 32.66 71.3
Jun-20 01:15 am 912.31 2.3 322 3.01 95 92 32.66 72.2
Jun-20 12:15 am 912.31 2.3 322 3.01 95 92 32.66 73.5
Jun-19 11:15 pm 912.31 2.3 322 3.00 94 92 32.66 74.4
Jun-19 10:15 pm 912.31 2.3 322 3.01 95 93 32.66 75.1
Maximum 24 Hour Drawdown Rate (5 feet/day): 122 cfs + Inflow (82 cfs) = 205 cfs
Report Generated June 21, 2025 02:19 am