| East Branch Dam, East Branch Naugatuck River | |||||||||
| Drainage Area: | 9 sq. miles  | ||||||||
| Channel Capacity: | 300 cfs | ||||||||
| Storage at Spillway Crest: | 8.8 in / 4,350 ac-ft | ||||||||
| Normal Pool: | 0 Feet | ||||||||
| Gate Settings for | Gate 1 | Gate 2 | Gate 3 | Gate 4 | Gate 5 | Gate 6 | Gate 7 | Gate 8 | |
| Date Time (EDT) | Pool (ft) |
Storage (%) |
Storage (ac-ft) |
Flow (cfs) |
Inflow (cfs) |
| Jan-14 03:00 am | 0.97 | 0.0 | 0 | 15 | |
| Jan-14 02:00 am | 0.98 | 0.0 | 0 | 15 | |
| Jan-14 01:00 am | 0.98 | 0.0 | 0 | 15 | |
| Jan-14 12:00 am | 0.98 | 0.0 | 0 | 15 | |
| Jan-13 11:00 pm | 0.95 | 0.0 | 0 | 15 | |
| Jan-13 10:00 pm | 0.98 | 0.0 | 0 | 15 | |
| Jan-13 09:00 pm | |||||
| Jan-13 08:00 pm | |||||
| Jan-13 07:00 pm | |||||
| Jan-13 06:00 pm | |||||
| Jan-13 05:00 pm | |||||
| Jan-13 04:00 pm | |||||
| Jan-13 03:00 pm | |||||
| Jan-13 02:00 pm | |||||
| Jan-13 01:00 pm | 0.96 | 0.0 | 0 | 15 | 15 |
| Jan-13 12:00 pm | 0.96 | 0.0 | 0 | 15 | 15 |
| Jan-13 11:00 am | 0.96 | 0.0 | 0 | 15 | 15 |
| Jan-13 10:00 am | 0.97 | 0.0 | 0 | 15 | 15 |
| Jan-13 09:00 am | 0.97 | 0.0 | 0 | 15 | 15 |
| Jan-13 08:00 am | 0.96 | 0.0 | 0 | 15 | 15 |
| Jan-13 07:00 am | 0.97 | 0.0 | 0 | 15 | 15 |
| Jan-13 06:00 am | 0.98 | 0.0 | 0 | 15 | 15 |
| Jan-13 05:00 am | 0.97 | 0.0 | 0 | 15 | 15 |
| Jan-13 04:00 am | 0.97 | 0.0 | 0 | 15 | 15 |
| Jan-13 03:00 am | 0.98 | 0.0 | 0 | 15 | 15 |
| Maximum 24 Hour Drawdown Rate Not Available - Missing Pool Data | |||||
| Report Generated January 14, 2026 08:30 am | |||||