Blackwater Dam, Blackwater River | |||||||||
Drainage Area: | 128 sq. miles  | ||||||||
Channel Capacity: | 2,300 cfs | ||||||||
Storage at Spillway Crest: | 6.74 in / 46,000 ac-ft | ||||||||
Normal Pool: | 516 Feet NGVD | ||||||||
Gate Settings for December 13, 2024 07:00 am | Gate 1 | Gate 2 | Gate 3 | Gate 4 | Gate 5 | Gate 6 | Gate 7 | Gate 8 | |
4.0 | 4.0 | 4.0 |
Date Time (Eastern) |
Pool (ft) |
Storage (%) |
Storage (ac-ft) |
Tailwater (ft) |
Flow (cfs) |
Inflow (cfs) |
Precip (in) |
Dec-14 01:30 am | 522.64 | 0.4 | 182 | 4.09 | 412 | 491 | 7.95 |
Dec-14 12:30 am | 522.51 | 0.4 | 176 | 4.11 | 421 | 488 | 7.95 |
Dec-13 11:30 pm | 522.32 | 0.3 | 166 | 4.14 | 435 | 481 | 7.95 |
Dec-13 10:30 pm | 522.21 | 0.3 | 161 | 4.18 | 453 | 482 | 7.95 |
Dec-13 09:30 pm | 522.19 | 0.3 | 160 | 4.21 | 466 | 494 | 7.95 |
Dec-13 08:30 pm | 522.19 | 0.3 | 160 | 4.23 | 474 | 513 | 7.95 |
Dec-13 07:30 pm | 522.22 | 0.3 | 161 | 4.25 | 483 | 532 | 7.95 |
Dec-13 06:30 pm | 522.23 | 0.3 | 162 | 4.26 | 487 | 546 | 7.95 |
Dec-13 05:30 pm | 522.21 | 0.3 | 161 | 4.27 | 491 | 549 | 7.95 |
Dec-13 04:30 pm | 522.17 | 0.3 | 159 | 4.27 | 491 | 539 | 7.95 |
Dec-13 03:30 pm | 522.08 | 0.3 | 154 | 4.27 | 491 | 511 | 7.95 |
Dec-13 02:30 pm | 521.90 | 0.3 | 146 | 4.24 | 478 | 485 | 7.95 |
Dec-13 01:30 pm | 521.69 | 0.3 | 138 | 4.19 | 458 | 457 | 7.95 |
Dec-13 12:30 pm | 521.46 | 0.2 | 128 | 4.14 | 435 | 431 | 7.95 |
Dec-13 11:30 am | 521.27 | 0.2 | 121 | 4.08 | 408 | 410 | 7.95 |
Dec-13 10:30 am | 521.16 | 0.2 | 116 | 4.04 | 390 | 393 | 7.95 |
Dec-13 09:30 am | 521.17 | 0.2 | 117 | 4.00 | 373 | 392 | 7.95 |
Dec-13 08:30 am | 521.04 | 0.2 | 112 | 3.95 | 353 | 380 | 7.95 |
Dec-13 07:30 am | 520.90 | 0.2 | 107 | 3.92 | 341 | 369 | 7.95 |
Dec-13 06:30 am | 520.72 | 0.2 | 102 | 3.89 | 330 | 358 | 7.95 |
Dec-13 05:30 am | 520.54 | 0.2 | 96 | 3.85 | 316 | 344 | 7.95 |
Dec-13 04:30 am | 520.43 | 0.2 | 93 | 3.85 | 316 | 334 | 7.95 |
Dec-13 03:30 am | 520.28 | 0.2 | 88 | 3.84 | 313 | 321 | 7.95 |
Dec-13 02:30 am | 520.15 | 0.2 | 85 | 3.80 | 302 | 308 | 7.95 |
Dec-13 01:30 am | 520.04 | 0.2 | 81 | 3.76 | 291 | 297 | 7.95 |
Maximum 24 Hour Drawdown Rate (10 feet/day): 92 cfs + Inflow (491 cfs) = 583 cfs | |||||||
Report Generated December 14, 2024 07:06 am |