| Westville Dam, Quinebaug River | |||||||||
| Drainage Area: | 99 sq. miles  | ||||||||
| Channel Capacity: | 1,600 cfs | ||||||||
| Storage at Spillway Crest: | 6.44 in / 11,100 ac-ft | ||||||||
| Normal Pool: | 10.5 Feet | ||||||||
| Gate Settings for May 16, 2026 07:59 am | Gate 1 | Gate 2 | Gate 3 | Gate 4 | Gate 5 | Gate 6 | Gate 7 | Gate 8 | |
| 0.0 | 6.0 | 0.0 | |||||||
| Date Time (Eastern) |
Pool (ft) |
Storage (%) |
Storage (ac-ft) |
Tailwater (ft) |
Flow (cfs) |
Inflow (cfs) |
Precip (in) |
| May-16 01:15 pm | 12.31 | 0.6 | 164 | 4.53 | 309 | 300 | 21.27 |
| May-16 12:15 pm | 12.31 | 0.6 | 164 | 4.49 | 291 | 298 | 21.27 |
| May-16 11:15 am | 12.30 | 0.6 | 164 | 4.51 | 300 | 296 | 21.27 |
| May-16 10:15 am | 12.29 | 0.6 | 164 | 4.51 | 300 | 293 | 21.27 |
| May-16 09:15 am | 12.29 | 0.6 | 164 | 4.51 | 300 | 291 | 21.27 |
| May-16 08:15 am | 12.28 | 0.6 | 163 | 4.48 | 287 | 289 | 21.27 |
| May-16 07:15 am | 12.27 | 0.6 | 163 | 4.47 | 283 | 287 | 21.27 |
| May-16 06:15 am | 12.27 | 0.6 | 163 | 4.48 | 287 | 285 | 21.27 |
| May-16 05:15 am | 12.26 | 0.6 | 163 | 4.47 | 283 | 282 | 21.27 |
| May-16 04:15 am | 12.25 | 0.6 | 162 | 4.46 | 278 | 279 | 21.27 |
| May-16 03:15 am | 12.24 | 0.6 | 162 | 4.47 | 283 | 276 | 21.27 |
| May-16 02:15 am | 12.24 | 0.6 | 162 | 4.46 | 278 | 271 | 21.27 |
| May-16 01:15 am | 12.23 | 0.6 | 162 | 4.46 | 278 | 270 | 21.27 |
| May-16 12:15 am | 12.21 | 0.6 | 161 | 4.43 | 266 | 266 | 21.27 |
| May-15 11:15 pm | 12.20 | 0.6 | 161 | 4.42 | 262 | 264 | 21.27 |
| May-15 10:15 pm | 12.19 | 0.6 | 160 | 4.42 | 262 | 261 | 21.27 |
| May-15 09:15 pm | 12.18 | 0.6 | 160 | 4.40 | 253 | 257 | 21.27 |
| May-15 08:15 pm | 12.17 | 0.6 | 160 | 4.42 | 262 | 255 | 21.27 |
| May-15 07:15 pm | 12.15 | 0.5 | 159 | 4.41 | 258 | 252 | 21.27 |
| May-15 06:15 pm | 12.14 | 0.5 | 159 | 4.39 | 249 | 250 | 21.27 |
| May-15 05:15 pm | 12.13 | 0.5 | 158 | 4.41 | 258 | 248 | 21.27 |
| May-15 04:15 pm | 12.12 | 0.5 | 158 | 4.38 | 244 | 246 | 21.27 |
| May-15 03:15 pm | 12.11 | 0.5 | 158 | 4.37 | 240 | 243 | 21.27 |
| May-15 02:15 pm | 12.11 | 0.5 | 158 | 4.39 | 249 | 241 | 21.27 |
| May-15 01:15 pm | 12.10 | 0.5 | 157 | 4.37 | 240 | 238 | 21.27 |
| Maximum 24 Hour Drawdown Rate (5 feet/day): 56 cfs + Inflow (300 cfs) = 356 cfs | |||||||
| Report Generated May 16, 2026 01:27 pm | |||||||