West Hill Dam, West River

West Hill Dam, West River
 Drainage Area: 28 sq. miles 
 Channel Capacity: 425 cfs 
 Storage at Spillway Crest: 8.33 in / 12,440 ac-ft  
 Normal Pool: 2 Feet 
 Gate Settings for May 12, 2025 07:00 am Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 Gate 6 Gate 7 Gate 8
  2.0 2.0 2.0          
Date Time
(Eastern)
Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Air Temp
(F)
May-13 04:30 am 3.90 1.0 151 2.32 80 32 25.90 50.0
May-13 03:30 am 3.94 1.0 155 2.33 81 31 25.90 52.0
May-13 02:30 am 3.98 1.0 158 2.34 82 26 25.90 53.0
May-13 01:30 am 4.01 1.0 161 2.35 83 24 25.90 54.3
May-13 12:30 am 4.06 1.1 167 2.36 84 26 25.90 54.7
May-12 11:30 pm 4.10 1.1 171 2.37 85 23 25.90 56.1
May-12 10:30 pm 4.15 1.2 177 2.38 86 22 25.90 58.7
May-12 09:30 pm 4.19 1.2 181 2.40 88 21 25.90 60.9
May-12 08:30 pm 4.25 1.3 188 2.41 89 23 25.90 64.1
May-12 07:30 pm 4.29 1.3 192 2.42 91 20 25.90 67.5
May-12 06:30 pm 4.34 1.3 197 2.43 92 17 25.90 71.3
May-12 05:30 pm 4.40 1.4 204 2.45 94 16 25.90 73.8
May-12 04:30 pm 4.46 1.5 211 2.46 95 18 25.90 73.8
May-12 03:30 pm 4.51 1.5 216 2.47 96 15 25.90 73.4
May-12 02:30 pm 4.57 1.6 223 2.49 99 15 25.90 72.3
May-12 01:30 pm 4.63 1.6 229 2.50 100 12 25.90 70.1
May-12 12:30 pm 4.70 1.7 237 2.52 102 9 25.90 69.4
May-12 11:30 am 4.77 1.8 245 2.53 104 9 25.90 66.9
May-12 10:30 am 4.83 1.8 251 2.55 106 6 25.90 64.0
May-12 09:30 am 4.90 1.9 259 2.55 106 9 25.90 60.8
May-12 08:30 am 4.97 2.0 267 2.57 109 5 25.90 54.4
May-12 07:30 am 5.04 2.0 276 2.57 109 10 25.90 45.2
May-12 06:30 am 5.11 2.1 285 2.58 110 17 25.90 38.5
May-12 05:30 am 5.17 2.2 294 2.59 111 17 25.90 35.8
May-12 04:30 am 5.23 2.2 302 2.60 112 24 25.90 36.9
Maximum 24 Hour Drawdown Rate (5 feet/day): 76 cfs + Inflow (32 cfs) = 108 cfs
Report Generated May 13, 2025 09:02 am