West Hill Dam, West River

West Hill Dam, West River
 Drainage Area: 28 sq. miles 
 Channel Capacity: 425 cfs 
 Storage at Spillway Crest: 8.33 in / 12,440 ac-ft  
 Normal Pool: 2 Feet 
 Gate Settings for February 02, 2023 07:00 am Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 Gate 6 Gate 7 Gate 8
  2.0 2.0 2.0          
Date Time
(Eastern)
Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Air Temp
(F)
Feb-08 02:00 pm 3.06 0.6 75 2.06 54 54 16.78  
Feb-08 01:00 pm 3.07 0.6 76 2.06 54 56 16.78 44.6
Feb-08 12:00 pm 3.06 0.6 75 2.05 54 52 16.78 44.2
Feb-08 11:00 am 3.06 0.6 75 2.05 54 52 16.78 42.6
Feb-08 10:00 am 3.06 0.6 75 2.05 54 52 16.78 40.6
Feb-08 09:00 am 3.06 0.6 75 2.05 54 52 16.78 37.9
Feb-08 08:00 am 3.06 0.6 75 2.05 54 52 16.78 33.5
Feb-08 07:00 am 3.06 0.6 75 2.05 54 52 16.78 33.1
Feb-08 06:00 am 3.07 0.6 76 2.05 54 54 16.78 32.6
Feb-08 05:00 am 3.07 0.6 76 2.05 54 54 16.78 33.3
Feb-08 04:00 am 3.07 0.6 76 2.05 54 54 16.78 34.9
Feb-08 03:00 am 3.07 0.6 76 2.05 54 54 16.78 34.9
Feb-08 02:00 am 3.07 0.6 76 2.05 54 54 16.77 34.5
Feb-08 01:00 am 3.07 0.6 76 2.06 54 53 16.73 34.2
Feb-08 12:00 am 3.07 0.6 76 2.06 54 53 16.73 32.6
Feb-07 11:00 pm 3.07 0.6 76 2.06 54 53 16.73 32.1
Feb-07 10:00 pm 3.07 0.6 76 2.06 54 53 16.73 31.6
Feb-07 09:00 pm 3.07 0.6 76 2.06 54 53 16.73 32.2
Feb-07 08:00 pm 3.07 0.6 76 2.06 54 51 16.73 32.0
Feb-07 07:00 pm 3.08 0.6 77 2.06 54 53 16.73 33.7
Feb-07 06:00 pm 3.08 0.6 77 2.06 54 53 16.73 34.2
Feb-07 05:00 pm 3.08 0.6 77 2.06 54 53 16.73 35.7
Feb-07 04:00 pm 3.08 0.6 77 2.06 54 53 16.73 37.2
Feb-07 03:00 pm 3.08 0.6 77 2.06 54 53 16.73 38.0
Feb-07 02:00 pm 3.09 0.6 78 2.07 55 54 16.73 39.4
Maximum 24 Hour Drawdown Rate (5 feet/day): 38 cfs + Inflow (54 cfs) = 92 cfs
Report Generated February 08, 2023 02:15 pm