Townshend Dam, West River

Townshend Dam, West River
 Drainage Area: 278 sq. miles 
 Channel Capacity: 9,000 cfs 
 Storage at Spillway Crest: 5.81 in / 32,900 ac-ft  
 Normal Pool: 21 Feet 
 Gate Settings for November 14, 2025 07:00 am Gate 1 Gate 2 Gate 3 Hydro Pos. Gate 5 Gate 6 Gate 7 Gate 8
  0.0 1.5 9.9 2        
Date Time
(Eastern)
Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Air Temp
(F)
Nov-17 07:15 am 23.56 1.0 320 5.47 830 834 6.29  
Nov-17 06:15 am 23.60 1.0 325 5.49 848 865 6.29 30.8
Nov-17 05:15 am 23.64 1.0 330 5.56 912 908 6.29 30.9
Nov-17 04:15 am 23.73 1.1 341 5.60 950 955 6.29 31.9
Nov-17 03:15 am 23.79 1.1 349 5.60 950 994 6.29 31.8
Nov-17 02:15 am 23.84 1.1 355 5.61 959 1,013 6.29 32.7
Nov-17 01:15 am 23.90 1.1 363 5.65 998 1,049 6.29 31.9
Nov-17 12:15 am 23.92 1.1 365 5.65 998 1,090 6.29 33.1
Nov-16 11:15 pm 23.88 1.1 360 5.62 969 1,150 6.29 34.3
Nov-16 10:15 pm 23.82 1.1 353 5.64 988 1,142 6.29 34.9
Nov-16 09:15 pm 23.83 1.1 354 5.85 1,206 1,133 6.29 36.1
Nov-16 08:15 pm 23.97 1.1 371 5.82 1,173 1,165 6.29 36.9
Nov-16 07:15 pm 24.04 1.2 380 5.82 1,173 1,158 6.29 37.1
Nov-16 06:15 pm 24.02 1.2 378 5.80 1,152 1,132 6.28 39.6
Nov-16 05:15 pm 23.81 1.1 351 5.73 1,078 1,059 6.28 39.0
Nov-16 04:15 pm 23.86 1.1 358 5.66 1,008 1,041 6.28 40.3
Nov-16 03:15 pm 23.83 1.1 354 5.59 940 999 6.28 44.5
Nov-16 02:15 pm 23.67 1.0 334 5.62 969 924 6.28 43.7
Nov-16 01:15 pm 23.61 1.0 326 5.63 978 872 6.28 43.4
Nov-16 12:15 pm 23.53 1.0 316 5.51 866 823 6.28 44.5
Nov-16 11:15 am 23.44 1.0 305 5.44 804 766 6.28 44.8
Nov-16 10:15 am 23.36 0.9 295 5.38 754 697 6.28 46.9
Nov-16 09:15 am 23.33 0.9 291 5.28 678 620 6.28 48.6
Nov-16 08:15 am 23.27 0.9 284 5.16 601 541 6.28 48.0
Nov-16 07:15 am 23.14 0.8 268 5.02 520 465 6.28 42.0
Maximum 24 Hour Drawdown Rate (10 feet/day): 161 cfs + Inflow (834 cfs) = 996 cfs
Report Generated November 17, 2025 07:27 am