Townshend Dam, West River

Townshend Dam, West River
 Drainage Area: 278 sq. miles 
 Channel Capacity: 9,000 cfs 
 Storage at Spillway Crest: 5.81 in / 32,900 ac-ft  
 Normal Pool: 21 Feet 
 Gate Settings for June 20, 2024 07:00 am Gate 1 Gate 2 Gate 3 Hydro Pos. Gate 5 Gate 6 Gate 7 Gate 8
  9.9 0.4 0.0 2        
Date Time
(Eastern)
Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Air Temp
(F)
Jun-25 12:45 am 22.84 0.7 230 4.51 244 303 45.14  
Jun-24 11:45 pm 22.78 0.7 223 4.50 240 299 45.14 58.9
Jun-24 10:45 pm 22.74 0.7 218 4.50 240 301 45.14 60.7
Jun-24 09:45 pm 22.75 0.7 219 4.59 276 307 45.14 62.0
Jun-24 08:45 pm 22.74 0.7 218 4.65 303 323 45.14 62.8
Jun-24 07:45 pm 22.77 0.7 221 4.65 303 342 45.14 63.8
Jun-24 06:45 pm 22.71 0.7 214 4.64 298 341 45.14 64.3
Jun-24 05:45 pm 22.71 0.7 214 4.79 369 335 45.14 64.8
Jun-24 04:45 pm 22.75 0.7 219 4.78 364 315 45.14 65.8
Jun-24 03:45 pm 22.83 0.7 229 4.88 417 372 45.14 67.6
Jun-24 02:45 pm 22.85 0.7 231 4.89 422 439 45.14 68.8
Jun-24 01:45 pm 22.89 0.8 236 4.92 439 471 45.14 67.9
Jun-24 12:45 pm 22.93 0.8 241 5.00 486 450 45.14 68.0
Jun-24 11:45 am 23.07 0.8 259 5.05 517 444 45.14 67.4
Jun-24 10:45 am 23.30 0.9 288 5.01 492 423 45.14 68.1
Jun-24 09:45 am 23.18 0.9 273 4.75 349 320 45.14 66.7
Jun-24 08:45 am 22.87 0.7 234 4.65 303 219 45.14 65.4
Jun-24 07:45 am 22.69 0.7 211 4.75 349 192 45.14 64.9
Jun-24 06:45 am 22.76 0.7 220 4.82 385 268 45.14 64.2
Jun-24 05:45 am 22.87 0.7 234 4.90 428 357 45.14 65.0
Jun-24 04:45 am 23.13 0.8 266 5.06 523 380 45.14 64.7
Jun-24 03:45 am 23.50 1.0 313 5.20 616 437 45.14 65.4
Jun-24 02:45 am 23.79 1.1 349 5.21 623 446 45.14 66.1
Jun-24 01:45 am 23.93 1.1 366 5.10 548 424 45.13 66.6
Jun-24 12:45 am 23.80 1.1 350 4.93 445 315 45.13 66.2
Maximum 24 Hour Drawdown Rate (10 feet/day): 116 cfs + Inflow (303 cfs) = 419 cfs
Report Generated June 25, 2024 01:00 am