Townshend Dam, West River

Townshend Dam, West River
 Drainage Area: 278 sq. miles 
 Channel Capacity: 9,000 cfs 
 Storage at Spillway Crest: 5.81 in / 32,900 ac-ft  
 Normal Pool: 21 Feet 
 Gate Settings for February 08, 2023 07:00 am Gate 1 Gate 2 Gate 3 Hydro Pos. Gate 5 Gate 6 Gate 7 Gate 8
  0.0 0.8 9.9 2        
Date Time
(Eastern)
Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Air Temp
(F)
Feb-08 02:30 pm 22.88 0.9 235 5.02 760 795 19.89 43.2
Feb-08 01:30 pm 22.84 0.9 230 5.02 760 784 19.89 42.1
Feb-08 12:30 pm 22.80 0.9 225 5.02 760 773 19.89 41.0
Feb-08 11:30 am 22.78 0.9 223 5.04 774 766 19.89 40.5
Feb-08 10:30 am 22.78 0.9 223 5.03 767 769 19.89 38.0
Feb-08 09:30 am 22.77 0.9 221 5.03 767 765 19.89 37.7
Feb-08 08:30 am 22.76 0.9 220 5.03 767 766 19.89 38.3
Feb-08 07:30 am 22.77 0.9 221 5.03 767 773 19.89 37.8
Feb-08 06:30 am 22.78 0.9 223 5.03 767 756 19.89 38.7
Feb-08 05:30 am 22.79 0.9 224 5.04 774 742 19.89 35.9
Feb-08 04:30 am 22.78 0.9 223 5.04 774 730 19.89 32.4
Feb-08 03:30 am 22.79 0.9 224 5.04 774 727 19.89 30.2
Feb-08 02:30 am 22.78 0.9 223 5.03 767 727 19.89 29.7
Feb-08 01:30 am 22.76 0.9 220 5.03 767 723 19.89 29.5
Feb-08 12:30 am 22.89 0.9 236 5.18 877 750 19.89 29.9
Feb-07 11:30 pm 23.02 1.0 253 5.18 877 771 19.89 29.3
Feb-07 10:30 pm 23.13 1.1 266 5.18 877 783 19.89 29.4
Feb-07 09:30 pm 23.22 1.1 278 5.18 877 790 19.89 30.1
Feb-07 08:30 pm 23.28 1.1 285 5.19 884 789 19.88 29.9
Feb-07 07:30 pm 23.35 1.2 294 5.05 781 790 19.86 30.1
Feb-07 06:30 pm 23.33 1.2 291 5.04 774 784 19.80 32.2
Feb-07 05:30 pm 23.26 1.1 283 4.89 669 770 19.80 33.4
Feb-07 04:30 pm 23.18 1.1 273 4.88 662 760 19.80 34.5
Feb-07 03:30 pm 23.10 1.1 263 4.87 656 746 19.80 35.2
Feb-07 02:30 pm 23.02 1.0 253 4.88 662 737 19.80 34.8
Maximum 24 Hour Drawdown Rate (10 feet/day): 118 cfs + Inflow (795 cfs) = 914 cfs
Report Generated February 08, 2023 02:46 pm