Tully Dam, E.B. Tully River

Tully Dam, E.B. Tully River
 Drainage Area: 50 sq. miles 
 Channel Capacity: 825 cfs 
 Storage at Spillway Crest: 8.06 in / 21,500 ac-ft  
 Normal Pool: 16 Feet (Summer), 13 Feet (Winter) 
 Gate Settings for January 10, 2025 09:40 am Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 Gate 6 Gate 7 Gate 8
  0.1 0.1            
Date Time
(Eastern)
Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Air Temp
(F)
Jan-12 07:30 pm 11.15 0.1 19 2.72 13 31 8.80  
Jan-12 06:30 pm 11.14 0.1 18 2.72 13 33 8.80 24.4
Jan-12 05:30 pm 11.12 0.1 15 2.72 13 31 8.80 27.1
Jan-12 04:30 pm 11.11 0.1 14 2.72 13 31 8.80 32.7
Jan-12 03:30 pm 11.10 0.1 13 2.72 13 31 8.80 34.5
Jan-12 02:30 pm 11.09 0.1 11 2.72 13 33 8.80 34.2
Jan-12 01:30 pm 11.08 0.0 10 2.72 13 33 8.80 33.5
Jan-12 12:30 pm 11.06 0.0 8 2.72 13 28 8.80 31.7
Jan-12 11:30 am 11.05 0.0 6 2.72 13 26 8.80 30.3
Jan-12 10:30 am 11.04 0.0 5 2.72 13 23 8.80 28.1
Jan-12 09:30 am 11.03 0.0 4 2.72 13 21 8.80 25.6
Jan-12 08:30 am 11.01 0.0 1 2.72 13 16 8.80 23.0
Jan-12 07:30 am 11.00 0.0 0 2.72 13 13 8.80 22.1
Jan-12 06:30 am 10.99 0.0 0 2.72 13 13 8.80 23.0
Jan-12 05:30 am 10.98 0.0 0 2.72 13 13 8.80 23.7
Jan-12 04:30 am 10.97 0.0 0 2.72 13 13 8.80 23.8
Jan-12 03:30 am 10.95 0.0 0 2.72 13 13 8.80 24.0
Jan-12 02:30 am 10.94 0.0 0 2.72 13 13 8.80 24.2
Jan-12 01:30 am 10.93 0.0 0 2.72 13 13 8.80 22.9
Jan-12 12:30 am 10.92 0.0 0 2.72 13 13 8.80 22.1
Jan-11 11:30 pm 10.90 0.0 0 2.72 13 13 8.80 22.1
Jan-11 10:30 pm 10.89 0.0 0 2.72 13 13 8.80 22.6
Jan-11 09:30 pm 10.88 0.0 0 2.72 13 13 8.80 22.8
Jan-11 08:30 pm 10.87 0.0 0 2.72 13 13 8.80 23.2
Jan-11 07:30 pm 10.86 0.0 0 2.72 13 13 8.80 24.0
Maximum 24 Hour Drawdown Rate (5 feet/day): 9 cfs + Inflow (31 cfs) = 40 cfs
Report Generated January 13, 2025 12:35 am