Mad River Dam, Mad River | |||||||||
Drainage Area: | 18 sq. miles  | ||||||||
Channel Capacity: | 600 cfs | ||||||||
Storage at Spillway Crest: | 9.79 in / 9,510 ac-ft | ||||||||
Normal Pool: | 17 Feet | ||||||||
Gate Settings for | Gate 1 | Gate 2 | Gate 3 | Gate 4 | Gate 5 | Gate 6 | Gate 7 | Gate 8 | |
Date Time (EDT) | Pool (ft) |
Storage (%) |
Storage (ac-ft) |
Flow (cfs) |
Inflow (cfs) |
Jan-12 05:30 pm | 16.97 | 0.0 | 0 | 16 | 16 |
Jan-12 04:30 pm | 16.97 | 0.0 | 0 | 16 | 16 |
Jan-12 03:30 pm | 16.96 | 0.0 | 0 | 16 | 16 |
Jan-12 02:30 pm | 16.96 | 0.0 | 0 | 16 | 16 |
Jan-12 01:30 pm | 16.96 | 0.0 | 0 | 16 | 16 |
Jan-12 12:30 pm | 16.98 | 0.0 | 0 | 16 | 16 |
Jan-12 11:30 am | 16.98 | 0.0 | 0 | 16 | 16 |
Jan-12 10:30 am | 16.96 | 0.0 | 0 | 16 | 16 |
Jan-12 09:30 am | 16.94 | 0.0 | 0 | 16 | 16 |
Jan-12 08:30 am | 16.97 | 0.0 | 0 | 16 | 16 |
Jan-12 07:30 am | 16.96 | 0.0 | 0 | 16 | 16 |
Jan-12 06:30 am | 16.96 | 0.0 | 0 | 16 | 16 |
Jan-12 05:30 am | 16.97 | 0.0 | 0 | 16 | 16 |
Jan-12 04:30 am | 16.97 | 0.0 | 0 | 16 | 16 |
Jan-12 03:30 am | 16.98 | 0.0 | 0 | 16 | 16 |
Jan-12 02:30 am | 16.96 | 0.0 | 0 | 16 | 16 |
Jan-12 01:30 am | 16.99 | 0.0 | 0 | 16 | 16 |
Jan-12 12:30 am | 16.96 | 0.0 | 0 | 16 | 16 |
Jan-11 11:30 pm | 16.96 | 0.0 | 0 | 16 | 16 |
Jan-11 10:30 pm | 16.99 | 0.0 | 0 | 16 | 16 |
Jan-11 09:30 pm | 16.99 | 0.0 | 0 | 16 | 16 |
Jan-11 08:30 pm | 16.99 | 0.0 | 0 | 16 | 16 |
Jan-11 07:30 pm | 16.97 | 0.0 | 0 | 16 | 16 |
Jan-11 06:30 pm | 16.97 | 0.0 | 0 | 16 | 16 |
Jan-11 05:30 pm | 16.98 | 0.0 | 0 | 16 | 16 |
Maximum 24 Hour Drawdown Rate Not Available - Missing Pool Data | |||||
Report Generated January 12, 2025 11:25 pm |