Our new website can be found at: https://water.usace.army.mil/office/nae. All USACE water management offices will be moving under the national Access to Water domain in the near future. Please provide any comments to: NAE.RCC@usace.army.mil
Hodges Village Dam, French River

Hodges Village Dam, French River
 Drainage Area: 31 sq. miles 
 Channel Capacity: 525 cfs 
 Storage at Spillway Crest: 8 in / 13,250 ac-ft  
 Normal Pool: 0 Feet 
 Gate Settings for July 11, 2026 11:11 am Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 Gate 6 Gate 7 Gate 8
  2.0 2.0            
Date Time
(Eastern)
Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Jul-13 02:30 am 2.59 0.1 12 0.89 8 8 1.90
Jul-13 01:30 am 2.59 0.1 12 0.89 8 8 1.90
Jul-13 12:30 am 2.59 0.1 12 0.89 8 8 1.90
Jul-12 11:30 pm 2.59 0.1 12 0.88 8 8 1.90
Jul-12 10:30 pm 2.59 0.1 12 0.88 8 8 1.90
Jul-12 09:30 pm 2.58 0.1 12 0.88 8 7 1.90
Jul-12 08:30 pm 2.58 0.1 12 0.88 8 7 1.90
Jul-12 07:30 pm 2.58 0.1 12 0.87 7 7 1.90
Jul-12 06:30 pm 2.58 0.1 12 0.87 7 7 1.90
Jul-12 05:30 pm 2.58 0.1 12 0.87 7 7 1.90
Jul-12 04:30 pm 2.58 0.1 12 0.87 7 7 1.90
Jul-12 03:30 pm 2.58 0.1 12 0.87 7 7 1.90
Jul-12 02:30 pm 2.58 0.1 12 0.88 8 7 1.90
Jul-12 01:30 pm 2.58 0.1 12 0.88 8 7 1.90
Jul-12 12:30 pm 2.59 0.1 12 0.88 8 8 1.90
Jul-12 11:30 am 2.59 0.1 12 0.89 8 8 1.90
Jul-12 10:30 am 2.61 0.1 13 0.89 8 8 1.90
Jul-12 09:30 am 2.61 0.1 13 0.90 8 8 1.90
Jul-12 08:30 am 2.61 0.1 13 0.91 9 8 1.90
Jul-12 07:30 am 2.62 0.1 13 0.91 9 8 1.90
Jul-12 06:30 am 2.62 0.1 13 0.91 9 9 1.90
Jul-12 05:30 am 2.62 0.1 13 0.91 9 9 1.90
Jul-12 04:30 am 2.62 0.1 13 0.91 9 9 1.90
Jul-12 03:30 am 2.62 0.1 13 0.92 9 9 1.90
Jul-12 02:30 am 2.64 0.1 13 0.92 9 9 1.90
Maximum 24 Hour Drawdown Rate (5 feet/day): 6 cfs + Inflow (8 cfs) = 14 cfs
Report Generated July 13, 2026 03:04 am