Hodges Village Dam, French River

Hodges Village Dam, French River
 Drainage Area: 31 sq. miles 
 Channel Capacity: 525 cfs 
 Storage at Spillway Crest: 8 in / 13,250 ac-ft  
 Normal Pool: 0 Feet 
 Gate Settings for April 18, 2025 07:00 am Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 Gate 6 Gate 7 Gate 8
  3.0 3.0            
Date Time
(Eastern)
Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Apr-19 11:30 am 5.11 0.6 87 1.61 65 51 18.60
Apr-19 10:30 am 5.14 0.7 89 1.61 65 54 18.60
Apr-19 09:30 am 5.15 0.7 90 1.62 66 52 18.60
Apr-19 08:30 am 5.18 0.7 92 1.62 66 54 18.60
Apr-19 07:30 am 5.20 0.7 93 1.62 66 56 18.60
Apr-19 06:30 am 5.21 0.7 94 1.63 68 55 18.60
Apr-19 05:30 am 5.23 0.7 95 1.63 68 54 18.60
Apr-19 04:30 am 5.24 0.7 96 1.64 69 55 18.60
Apr-19 03:30 am 5.27 0.7 98 1.64 69 56 18.60
Apr-19 02:30 am 5.29 0.7 99 1.65 71 59 18.60
Apr-19 01:30 am 5.30 0.7 100 1.65 71 58 18.60
Apr-19 12:30 am 5.32 0.7 101 1.65 71 60 18.60
Apr-18 11:30 pm 5.35 0.7 103 1.66 72 62 18.60
Apr-18 10:30 pm 5.36 0.7 103 1.66 72 63 18.60
Apr-18 09:30 pm 5.39 0.8 105 1.67 74 65 18.60
Apr-18 08:30 pm 5.39 0.8 105 1.67 74 65 18.60
Apr-18 07:30 pm 5.41 0.8 107 1.68 75 67 18.60
Apr-18 06:30 pm 5.42 0.8 107 1.68 75 66 18.60
Apr-18 05:30 pm 5.44 0.8 109 1.68 75 69 18.60
Apr-18 04:30 pm 5.45 0.8 109 1.70 78 70 18.60
Apr-18 03:30 pm 5.47 0.8 111 1.69 77 72 18.60
Apr-18 02:30 pm 5.47 0.8 111 1.69 77 73 18.60
Apr-18 01:30 pm 5.48 0.8 111 1.70 78 74 18.60
Apr-18 12:30 pm 5.50 0.8 113 1.70 78 77 18.60
Apr-18 11:30 am 5.50 0.8 113 1.70 78 77 18.60
Maximum 24 Hour Drawdown Rate (5 feet/day): 44 cfs + Inflow (51 cfs) = 94 cfs
Report Generated April 19, 2025 03:45 pm