Franklin Falls Dam, Pemigewasset River

Franklin Falls Dam, Pemigewasset River
 Drainage Area: 1,000 sq. miles 
 Channel Capacity: 18,000 cfs 
 Storage at Spillway Crest: 2.82 in / 150,600 ac-ft  
 Normal Pool: 307 Feet NGVD 
 Gate Settings for February 23, 2024 07:00 am Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 Gate 6 Gate 7 Gate 8
  10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
Date Time (EST) Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Air Temp
(F)
Feb-26 01:45 am           20.03  
Feb-26 12:45 am 306.55 0.0 0 896   20.03 24.0
Feb-25 11:45 pm 306.54 0.0 0 896 894 20.03 24.7
Feb-25 10:45 pm 306.54 0.0 0 890 894 20.03 29.0
Feb-25 09:45 pm 306.53 0.0 0 896 892 20.03 26.5
Feb-25 08:45 pm 306.53 0.0 0 890 890 20.03 27.4
Feb-25 07:45 pm 306.53 0.0 0 896 889 20.03 28.6
Feb-25 06:45 pm 306.53 0.0 0 890 888 20.03 30.3
Feb-25 05:45 pm 306.54 0.0 0 896 887 20.03 35.5
Feb-25 04:45 pm 306.54 0.0 0 883 886 20.03 38.2
Feb-25 03:45 pm 306.55 0.0 0 883   20.03 38.1
Feb-25 02:45 pm 306.54 0.0 0 883 890 20.03 38.5
Feb-25 01:45 pm 306.54 0.0 0 883 893 20.03 36.2
Feb-25 12:45 pm 306.53 0.0 0 890 906 20.03 35.4
Feb-25 11:45 am 306.51 0.0 0 890 921 20.03 32.5
Feb-25 10:45 am 306.49 0.0 0 890 936 20.03 27.1
Feb-25 09:45 am 306.47 0.0 0 890 952 20.03 24.9
Feb-25 08:45 am 306.46 0.0 0 909 979 20.03 21.3
Feb-25 07:45 am 306.45 0.0 0 928 1,010 20.03 16.4
Feb-25 06:45 am 306.45 0.0 0 982 1,040 20.03 12.9
Feb-25 05:45 am 306.46 0.0 0 982 1,067 20.03 12.5
Feb-25 04:45 am 306.46 0.0 0 989 1,095 20.03 12.8
Feb-25 03:45 am 306.47 0.0 0 1,030 1,120 20.03 13.2
Feb-25 02:45 am 306.49 0.0 0 1,065 1,135 20.03 13.6
Feb-25 01:45 am 306.50 0.0 0 1,135 1,145 20.03 14.2
Maximum 24 Hour Drawdown Rate (15 feet/day): 0 cfs + Inflow (894 cfs) = 894 cfs
Report Generated February 26, 2024 01:52 am