Edward MacDowell Dam, Nubanusit Brook

Edward Macdowell Dam, Nubanusit Brook
 Drainage Area: 44 sq. miles 
 Channel Capacity: 650 cfs 
 Storage at Spillway Crest: 5.45 in / 12,800 ac-ft  
 Normal Pool: 911.5 Feet NGVD 
 Gate Settings for November 17, 2025 06:06 am Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 Gate 6 Gate 7 Gate 8
  3.0 0.0 0.0          
Date Time
(Eastern)
Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Air Temp
(F)
Nov-17 08:30 am 911.44 1.4 205 2.27 27 34 5.31 28.7
Nov-17 07:30 am 911.44 1.4 205 2.28 28 34 5.31 28.5
Nov-17 06:30 am 911.43 1.4 204 2.28 28 34 5.31 28.4
Nov-17 05:30 am 911.44 1.4 205 2.28 28 40 5.31 28.0
Nov-17 04:30 am 911.45 1.5 206 2.29 29 41 5.31 28.3
Nov-17 03:30 am 911.44 1.4 205 2.29 29 36 5.31 28.5
Nov-17 02:30 am 911.43 1.4 204 2.29 29 38 5.31 28.5
Nov-17 01:30 am 911.43 1.4 204 2.31 30 40 5.31 29.2
Nov-17 12:30 am 911.42 1.4 203 2.31 30 38 5.31 29.8
Nov-16 11:30 pm 911.42 1.4 203 2.33 32 42 5.31 30.8
Nov-16 10:30 pm 911.43 1.4 204 2.36 34 52 5.31 31.8
Nov-16 09:30 pm 911.43 1.4 204 2.39 36 56 5.31 32.8
Nov-16 08:30 pm 911.42 1.4 203 2.42 38 43 5.31 34.1
Nov-16 07:30 pm 911.42 1.4 203 2.55 49 57 5.31 34.2
Nov-16 06:30 pm 911.42 1.4 203 2.64 57 57 5.31 34.1
Nov-16 05:30 pm 911.42 1.4 203 2.64 57 57 5.31 36.6
Nov-16 04:30 pm 911.42 1.4 203 2.64 57 62 5.31 38.2
Nov-16 03:30 pm 911.42 1.4 203 2.64 57 62 5.31 39.1
Nov-16 02:30 pm 911.44 1.4 205 2.64 57 79 5.31 40.1
Nov-16 01:30 pm 911.42 1.4 203 2.64 57 67 5.31 40.7
Nov-16 12:30 pm 911.42 1.4 203 2.65 58 67 5.31 41.6
Nov-16 11:30 am 911.42 1.4 203 2.64 57 67 5.31 42.4
Nov-16 10:30 am 911.41 1.4 201 2.63 56 61 5.31 43.7
Nov-16 09:30 am 911.41 1.4 201 2.63 56 61 5.31 46.5
Nov-16 08:30 am 911.40 1.4 200 2.63 56 56 5.31 45.2
Maximum 24 Hour Drawdown Rate (5 feet/day): 77 cfs + Inflow (34 cfs) = 111 cfs
Report Generated November 17, 2025 01:34 pm