Birch Hill Dam, Millers River

Birch Hill Dam, Millers River
 Drainage Area: 175 sq. miles 
 Channel Capacity: 2,800 cfs 
 Storage at Spillway Crest: 5.34 in / 49,900 ac-ft  
 Normal Pool: 0 Feet 
 Gate Settings for November 13, 2025 07:00 am Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 Gate 6 Gate 7 Gate 8
  3.0 3.0 3.0 3.0        
Date Time
(Eastern)
Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Air Temp
(F)
Nov-17 07:00 am 1.26 0.3 126 1.77 136 134 4.80  
Nov-17 06:00 am 1.26 0.3 126 1.76 133 134 4.80 28.3
Nov-17 05:00 am 1.26 0.3 126 1.76 133 133 4.80 27.8
Nov-17 04:00 am 1.25 0.3 125 1.76 133 131 4.80 28.3
Nov-17 03:00 am 1.25 0.3 125 1.75 130 130 4.80 29.2
Nov-17 02:00 am 1.25 0.3 125 1.76 133 129 4.80 29.8
Nov-17 01:00 am 1.25 0.3 125 1.75 130 129 4.80 30.5
Nov-17 12:00 am 1.25 0.3 125 1.75 130 128 4.80 30.7
Nov-16 11:00 pm 1.25 0.3 125 1.75 130 127 4.80 31.6
Nov-16 10:00 pm 1.25 0.3 125 1.74 127 127 4.80 31.9
Nov-16 09:00 pm 1.25 0.3 125 1.74 127 126 4.80 32.3
Nov-16 08:00 pm 1.25 0.3 125 1.74 127 126 4.80 32.9
Nov-16 07:00 pm 1.25 0.3 125 1.74 127 125 4.80 35.6
Nov-16 06:00 pm 1.25 0.3 125 1.74 127 124 4.80 35.7
Nov-16 05:00 pm 1.25 0.3 125 1.73 124 123 4.80 37.3
Nov-16 04:00 pm 1.25 0.3 125 1.73 124 122 4.73 41.3
Nov-16 03:00 pm 1.25 0.3 125 1.73 124 120 4.59 41.8
Nov-16 02:00 pm 1.25 0.3 125 1.73 124 118 4.45 43.7
Nov-16 01:00 pm 1.25 0.3 125 1.73 124 117 4.40 43.6
Nov-16 12:00 pm 1.25 0.3 125 1.72 121 114 4.39 43.7
Nov-16 11:00 am 1.25 0.3 125 1.70 115 112 4.38 46.0
Nov-16 10:00 am 1.25 0.3 125 1.71 118 110 4.37 45.5
Nov-16 09:00 am 1.25 0.3 125 1.69 113 108 4.36 46.2
Nov-16 08:00 am 1.25 0.3 125 1.69 113 106 4.35 44.4
Nov-16 07:00 am 1.25 0.3 125 1.68 110 105 4.34 44.3
Maximum 24 Hour Drawdown Rate (5 feet/day): 64 cfs + Inflow (134 cfs) = 198 cfs
Report Generated November 17, 2025 07:14 am