Townshend Dam, West River

Townshend Dam, West River
 Drainage Area: 278 sq. miles 
 Channel Capacity: 9,000 cfs 
 Storage at Spillway Crest: 5.81 in / 32,900 ac-ft  
 Normal Pool: 21 Feet 
 Gate Settings for July 23, 2024 07:00 am Gate 1 Gate 2 Gate 3 Hydro Pos. Gate 5 Gate 6 Gate 7 Gate 8
  9.9 0.2 0.0 2        
Date Time
(Eastern)
Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Air Temp
(F)
Jul-24 10:30 pm 23.39 0.9 299 4.28 153 226 1.33 68.9
Jul-24 09:30 pm 23.31 0.9 289 4.42 199 227 1.33 70.1
Jul-24 08:30 pm 23.35 0.9 294 4.28 153 222 1.33 71.0
Jul-24 07:30 pm 23.21 0.9 276 4.14 115 186 1.33 71.5
Jul-24 06:30 pm 23.16 0.9 270 4.14 115 188 1.33 72.2
Jul-24 05:30 pm 23.07 0.8 259 4.15 117 174 1.33 72.3
Jul-24 04:30 pm 23.06 0.8 258 4.14 115 202 1.33 71.9
Jul-24 03:30 pm 22.94 0.8 243 4.29 156 176 1.33 71.7
Jul-24 02:30 pm 22.98 0.8 248 4.29 156 179 1.33 72.0
Jul-24 01:30 pm 22.99 0.8 249 4.29 156 167 1.33 69.1
Jul-24 12:30 pm 22.97 0.8 246 4.40 192 145 1.32 69.9
Jul-24 11:30 am 22.99 0.8 249 4.41 196 177 1.30 69.5
Jul-24 10:30 am 22.92 0.8 240 4.41 196 153 1.30 70.0
Jul-24 09:30 am 22.95 0.8 244 4.41 196 203 1.30 68.7
Jul-24 08:30 am 23.03 0.8 254 4.66 296 219 1.29 66.8
Jul-24 07:30 am 23.18 0.9 273 4.67 301 245 1.29 66.5
Jul-24 06:30 am 23.33 0.9 291 4.60 270 245 1.29 66.0
Jul-24 05:30 am 23.27 0.9 284 4.56 253 193 1.29 65.7
Jul-24 04:30 am 23.29 0.9 286 4.23 139 190 1.29 65.8
Jul-24 03:30 am 23.05 0.8 256 3.82 58 125 1.29 66.0
Jul-24 02:30 am 22.95 0.8 244 3.99 84 107 1.29 66.2
Jul-24 01:30 am 22.85 0.7 231 3.91 71 75 1.29 66.4
Jul-24 12:30 am 22.85 0.7 231 3.91 71 84 1.17 66.5
Jul-23 11:30 pm 22.87 0.7 234 3.92 72 84 1.12 66.5
Jul-23 10:30 pm 22.82 0.7 228 3.76 51 67 0.89 67.0
Maximum 24 Hour Drawdown Rate (10 feet/day): 151 cfs + Inflow (226 cfs) = 376 cfs
Report Generated July 25, 2024 02:55 am