Littleville Dam, M.B. Westfield River

Littleville Dam, M.B. Westfield River
 Drainage Area: 52 sq. miles 
 Channel Capacity: 1,500 cfs 
 Storage at Spillway Crest: 8.32 in / 23,000 ac-ft  
 Normal Pool: 518 Feet NGVD 
 Gate Settings for December 09, 2025 07:00 am Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 Gate 6 Gate 7 Gate 8
  2.0 2.0            
Date Time
(Eastern)
Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Air Temp
(F)
Dec-12 01:30 pm 518.94 1.4 295 1.93 42 43 8.14 32.6
Dec-12 12:30 pm 518.93 1.4 292 1.93 42 30 8.14 31.1
Dec-12 11:30 am 518.93 1.4 292 1.93 42 43 8.14 29.5
Dec-12 10:30 am 518.94 1.4 295 1.93 42 44 8.14 27.5
Dec-12 09:30 am 518.93 1.4 292 1.94 43 19 8.14 24.8
Dec-12 08:30 am 518.93 1.4 292 1.94 43 19 8.14 22.7
Dec-12 07:30 am 518.94 1.4 295 1.95 44 26 8.14 20.3
Dec-12 06:30 am 518.95 1.4 298 1.95 44 45 8.14 20.3
Dec-12 05:30 am 518.93 1.4 292 1.96 45 26 8.14 20.3
Dec-12 04:30 am 518.94 1.4 295 1.96 45 27 8.14 20.5
Dec-12 03:30 am 518.97 1.5 305 1.96 45 46 8.14 20.5
Dec-12 02:30 am 518.97 1.5 305 1.97 46 52 8.14 20.9
Dec-12 01:30 am 518.97 1.5 305 1.97 46 40 8.14 22.2
Dec-12 12:30 am 518.95 1.4 298 1.97 46 40 8.14 22.6
Dec-11 11:30 pm 518.96 1.4 301 1.98 47 40 8.14 22.9
Dec-11 10:30 pm 518.97 1.5 305 1.98 47 47 8.14 22.8
Dec-11 09:30 pm 518.97 1.5 305 1.98 47 47 8.14 23.3
Dec-11 08:30 pm 518.96 1.4 301 1.98 47 41 8.14 23.6
Dec-11 07:30 pm 518.98 1.5 308 1.98 47 53 8.14 23.2
Dec-11 06:30 pm 518.96 1.4 301 1.98 47 35 8.14 23.2
Dec-11 05:30 pm 518.97 1.5 305 1.99 47 47 8.14 23.9
Dec-11 04:30 pm 518.97 1.5 305 1.99 47 47 8.14 24.8
Dec-11 03:30 pm 518.97 1.5 305 1.99 47 47 8.14  
Dec-11 02:30 pm 518.97 1.5 305 1.99 47 53 8.14 27.9
Dec-11 01:30 pm 518.97 1.5 305 1.98 47 47 8.14 28.4
Maximum 24 Hour Drawdown Rate (5 feet/day): 149 cfs + Inflow (43 cfs) = 191 cfs
Report Generated December 12, 2025 06:58 pm