Littleville Dam, M.B. Westfield River

Littleville Dam, M.B. Westfield River
 Drainage Area: 52 sq. miles 
 Channel Capacity: 1,500 cfs 
 Storage at Spillway Crest: 8.32 in / 23,000 ac-ft  
 Normal Pool: 518 Feet NGVD 
 Gate Settings for February 13, 2025 07:00 am Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 Gate 6 Gate 7 Gate 8
  1.5 1.5            
Date Time
(Eastern)
Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Air Temp
(F)
Feb-13 01:30 pm 518.74 1.1 232 1.75 31 31 8.43 36.5
Feb-13 12:30 pm 518.74 1.1 232 1.75 31 37 8.40 34.6
Feb-13 11:30 am 518.74 1.1 232 1.75 31 37 8.40 34.3
Feb-13 10:30 am 518.74 1.1 232 1.75 31 43 8.40 34.2
Feb-13 09:30 am       1.74 30      
Feb-13 08:30 am 518.73 1.1 229 1.74 30 42 8.40 32.3
Feb-13 07:30 am 518.74 1.1 232 1.74 30 48 8.40 31.3
Feb-13 06:30 am 518.73 1.1 229 1.74 30 41 8.40 30.6
Feb-13 05:30 am 518.73 1.1 229 1.73 29 41 8.40 29.9
Feb-13 04:30 am 518.72 1.1 226 1.72 29 34 8.40 28.4
Feb-13 03:30 am 518.72 1.1 226 1.71 28 34 8.40 28.2
Feb-13 02:30 am 518.71 1.1 223 1.71 28 28 8.40 28.0
Feb-13 01:30 am 518.71 1.1 223 1.70 28 28 8.40 27.7
Feb-13 12:30 am 518.71 1.1 223 1.70 28 28 8.40 27.7
Feb-12 11:30 pm 518.71 1.1 223 1.70 28 28 8.40 27.7
Feb-12 10:30 pm 518.71 1.1 223 1.70 28 28 8.40 27.9
Feb-12 09:30 pm 518.71 1.1 223 1.70 28 28 8.40 28.5
Feb-12 08:30 pm 518.71 1.1 223 1.70 28 28 8.40 29.0
Feb-12 07:30 pm 518.71 1.1 223 1.70 28 28 8.40 29.9
Feb-12 06:30 pm 518.71 1.1 223 1.70 28 28 8.40 30.7
Feb-12 05:30 pm 518.71 1.1 223 1.70 28 28 8.40 31.5
Feb-12 04:30 pm 518.71 1.1 223 1.70 28 28 8.40 32.4
Feb-12 03:30 pm 518.71 1.1 223 1.70 28 28 8.40 32.9
Feb-12 02:30 pm 518.71 1.1 223 1.70 28 28 8.40 33.0
Feb-12 01:30 pm 518.71 1.1 223 1.70 28 28 8.40 32.0
Maximum 24 Hour Drawdown Rate (5 feet/day): 117 cfs + Inflow (31 cfs) = 148 cfs
Report Generated February 13, 2025 02:14 pm