Hop Brook Dam, Hop Brook

Hop Brook Dam, Hop Brook
 Drainage Area: 16 sq. miles 
 Channel Capacity: 550 cfs 
 Storage at Spillway Crest: 7.8 in / 6,850 ac-ft  
 Normal Pool: 18.5 Feet 
 Gate Settings for June 02, 2025 07:00 am Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 Gate 6 Gate 7 Gate 8
  0.0 3.0            
Date Time
(Eastern)
Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Jun-02 08:30 pm 19.42 0.5 33       32.44
Jun-02 07:30 pm 19.42 0.5 33 1.90 22 22 32.44
Jun-02 06:30 pm 19.41 0.5 32 1.90 22 22 32.44
Jun-02 05:30 pm 19.41 0.5 32 1.90 22 22 32.44
Jun-02 04:30 pm 19.42 0.5 33 1.91 23   32.44
Jun-02 03:30 pm 19.42 0.5 33 1.91 23 22 32.44
Jun-02 02:30 pm 19.43 0.5 33 1.91 23 23 32.44
Jun-02 01:30 pm 19.43 0.5 33 1.92 24 23 32.44
Jun-02 12:30 pm 19.44 0.5 33 1.92 24 24 32.44
Jun-02 11:30 am 19.44 0.5 33 1.92 24 24 32.44
Jun-02 10:30 am              
Jun-02 09:30 am 19.45 0.5 33 1.93 25 25 32.44
Jun-02 08:30 am 19.45 0.5 33 1.93 25 25 32.44
Jun-02 07:30 am 19.46 0.5 34 1.94 26 25 32.44
Jun-02 06:30 am 19.46 0.5 34 1.94 26 25 32.44
Jun-02 05:30 am 19.46 0.5 34 1.94 26 25 32.44
Jun-02 04:30 am 19.47 0.5 34 1.95 27 26 32.44
Jun-02 03:30 am 19.47 0.5 34 1.95 27 26 32.44
Jun-02 02:30 am 19.47 0.5 34 1.95 27 27 32.44
Jun-02 01:30 am 19.48 0.5 34 1.96 28 27 32.44
Jun-02 12:30 am 19.49 0.5 34 1.96 28 28 32.44
Jun-01 11:30 pm 19.50 0.5 35 1.97 29 29 32.44
Jun-01 10:30 pm 19.50 0.5 35 1.98 30 29 32.43
Jun-01 09:30 pm 19.51 0.5 35 1.98 30 30 32.43
Jun-01 08:30 pm 19.52 0.5 35 1.99 31 31 32.43
Maximum 24 Hour Drawdown Rate (5 feet/day): 16 cfs + Inflow (22 cfs) = 39 cfs
Report Generated June 03, 2025 12:37 am