Edward MacDowell Dam, Nubanusit Brook

Edward Macdowell Dam, Nubanusit Brook
 Drainage Area: 44 sq. miles 
 Channel Capacity: 650 cfs 
 Storage at Spillway Crest: 5.45 in / 12,800 ac-ft  
 Normal Pool: 912 Feet NGVD 
 Gate Settings for February 23, 2024 07:00 am Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 Gate 6 Gate 7 Gate 8
  3.0 0.0 0.0          
Date Time
(Eastern)
Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Air Temp
(F)
Feb-26 03:15 am 912.11 2.1 292 2.74 66 66 13.57 27.1
Feb-26 02:15 am 912.11 2.1 292 2.73 65 66 13.57 26.6
Feb-26 01:15 am 912.11 2.1 292 2.73 65 66 13.57 25.3
Feb-26 12:15 am 912.11 2.1 292 2.74 66 66 13.57 25.7
Feb-25 11:15 pm 912.11 2.1 292 2.74 66 67 13.57 26.1
Feb-25 10:15 pm 912.11 2.1 292 2.74 66 67 13.57 26.3
Feb-25 09:15 pm 912.11 2.1 292 2.74 66 67 13.57 26.2
Feb-25 08:15 pm 912.11 2.1 292 2.74 66 67 13.57 26.7
Feb-25 07:15 pm 912.11 2.1 292 2.74 66 67 13.57 28.7
Feb-25 06:15 pm 912.11 2.1 292 2.74 66 67 13.57 29.6
Feb-25 05:15 pm 912.11 2.1 292 2.75 67 67 13.57 31.8
Feb-25 04:15 pm 912.11 2.1 292 2.74 66 67 13.57 35.6
Feb-25 03:15 pm 912.11 2.1 292 2.75 67 67 13.57 35.3
Feb-25 02:15 pm 912.11 2.1 292 2.75 67 61 13.57 33.7
Feb-25 01:15 pm 912.11 2.1 292 2.74 66 61 13.57 29.8
Feb-25 12:15 pm 912.11 2.1 292 2.74 66 61 13.57 28.9
Feb-25 11:15 am 912.11 2.1 292 2.75 67 61 13.57 24.4
Feb-25 10:15 am 912.11 2.1 292 2.75 67 56 13.57 20.0
Feb-25 09:15 am 912.11 2.1 292 2.75 67 56 13.57 16.9
Feb-25 08:15 am 912.13 2.1 295 2.75 67 59 13.57 14.2
Feb-25 07:15 am 912.13 2.1 295 2.75 67 57 13.57 11.4
Feb-25 06:15 am 912.13 2.1 295 2.75 67 54 13.57 9.7
Feb-25 05:15 am 912.13 2.1 295 2.75 67 54 13.57 9.5
Feb-25 04:15 am 912.15 2.2 298 2.76 68 61 13.57 9.3
Feb-25 03:15 am 912.15 2.2 298 2.77 69 58 13.57 9.6
Maximum 24 Hour Drawdown Rate (5 feet/day): 113 cfs + Inflow (66 cfs) = 180 cfs
Report Generated February 26, 2024 03:24 am