Blackwater Dam, Blackwater River

Blackwater Dam, Blackwater River
 Drainage Area: 128 sq. miles 
 Channel Capacity: 2,300 cfs 
 Storage at Spillway Crest: 6.74 in / 46,000 ac-ft  
 Normal Pool: 516 Feet NGVD 
 Gate Settings for July 12, 2024 07:00 am Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 Gate 6 Gate 7 Gate 8
  4.0 4.0 4.0          
Date Time
(Eastern)
Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Jul-13 12:30 am 516.33 0.0 13 2.24 41 41 32.40
Jul-12 11:30 pm 516.41 0.0 14 2.24 41 42 32.40
Jul-12 10:30 pm 516.35 0.0 14 2.24 41 41 32.40
Jul-12 09:30 pm 516.38 0.0 14 2.24 41 42 32.40
Jul-12 08:30 pm 516.35 0.0 14 2.24 41 40 32.40
Jul-12 07:30 pm 516.40 0.0 14 2.24 41 43 32.40
Jul-12 06:30 pm 516.32 0.0 13 2.24 41 41 32.40
Jul-12 05:30 pm 516.35 0.0 14 2.24 41 41 32.40
Jul-12 04:30 pm 516.33 0.0 13 2.25 42 42 32.40
Jul-12 03:30 pm 516.34 0.0 13 2.25 42 42 32.40
Jul-12 02:30 pm 516.40 0.0 14 2.25 42 43 32.40
Jul-12 01:30 pm 516.32 0.0 13 2.25 42 42 32.40
Jul-12 12:30 pm 516.36 0.0 14 2.25 42 43 32.40
Jul-12 11:30 am 516.40 0.0 14 2.25 42 43 32.40
Jul-12 10:30 am 516.31 0.0 13 2.25 42 42 32.40
Jul-12 09:30 am 516.31 0.0 13 2.25 42 40 32.40
Jul-12 08:30 am 516.34 0.0 13 2.26 43 42 32.40
Jul-12 07:30 am 516.35 0.0 14 2.26 43 43 32.40
Jul-12 06:30 am 516.33 0.0 13 2.26 43 42 32.40
Jul-12 05:30 am 516.39 0.0 14 2.26 43 43 32.40
Jul-12 04:30 am 516.34 0.0 13 2.26 43 42 32.40
Jul-12 03:30 am 516.42 0.0 14 2.26 43 44 32.40
Jul-12 02:30 am 516.37 0.0 14 2.26 43 42 32.40
Jul-12 01:30 am 516.35 0.0 14 2.26 43 42 32.40
Jul-12 12:30 am 516.39 0.0 14 2.26 43 43 32.40
Maximum 24 Hour Drawdown Rate (10 feet/day): 7 cfs + Inflow (41 cfs) = 48 cfs
Report Generated July 13, 2024 01:39 am