Birch Hill Dam, Millers River

Birch Hill Dam, Millers River
 Drainage Area: 175 sq. miles 
 Channel Capacity: 2,800 cfs 
 Storage at Spillway Crest: 5.34 in / 49,900 ac-ft  
 Normal Pool: 0 Feet 
 Gate Settings for November 13, 2025 07:00 am Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 Gate 6 Gate 7 Gate 8
  3.0 3.0 3.0 3.0        
Date Time
(Eastern)
Pool
(ft)
Storage
(%)
Storage
(ac-ft)
Tailwater
(ft)
Flow
(cfs)
Inflow
(cfs)
Precip
(in)
Air Temp
(F)
Nov-17 08:30 am 1.26 0.3 126 1.77 136 135 4.80 29.8
Nov-17 07:30 am 1.26 0.3 126 1.76 133 135 4.80 28.9
Nov-17 06:30 am 1.26 0.3 126 1.77 136 134 4.80 28.4
Nov-17 05:30 am 1.26 0.3 126 1.76 133 134 4.80 28.1
Nov-17 04:30 am 1.25 0.3 125 1.76 133 131 4.80 27.7
Nov-17 03:30 am 1.25 0.3 125 1.76 133 130 4.80 28.8
Nov-17 02:30 am 1.25 0.3 125 1.76 133 130 4.80 29.5
Nov-17 01:30 am 1.25 0.3 125 1.75 130 129 4.80 30.4
Nov-17 12:30 am 1.25 0.3 125 1.75 130 128 4.80 30.0
Nov-16 11:30 pm 1.25 0.3 125 1.75 130 128 4.80 30.8
Nov-16 10:30 pm 1.25 0.3 125 1.75 130 127 4.80 31.7
Nov-16 09:30 pm 1.25 0.3 125 1.75 130 127 4.80 32.3
Nov-16 08:30 pm 1.25 0.3 125 1.74 127 126 4.80 32.4
Nov-16 07:30 pm 1.25 0.3 125 1.74 127 125 4.80 35.3
Nov-16 06:30 pm 1.25 0.3 125 1.74 127 125 4.80 36.0
Nov-16 05:30 pm 1.25 0.3 125 1.74 127 124 4.80 36.1
Nov-16 04:30 pm 1.25 0.3 125 1.73 124 122 4.80 36.6
Nov-16 03:30 pm 1.25 0.3 125 1.74 127 121 4.66 41.8
Nov-16 02:30 pm 1.25 0.3 125 1.73 124 119 4.52 42.5
Nov-16 01:30 pm 1.25 0.3 125 1.73 124 117 4.40 43.4
Nov-16 12:30 pm 1.25 0.3 125 1.72 121 115 4.40 43.3
Nov-16 11:30 am 1.25 0.3 125 1.71 118 113 4.38 44.0
Nov-16 10:30 am 1.25 0.3 125 1.71 118 111 4.38 45.5
Nov-16 09:30 am 1.25 0.3 125 1.70 115 109 4.37 45.3
Nov-16 08:30 am 1.25 0.3 125 1.69 113 107 4.36 45.4
Maximum 24 Hour Drawdown Rate (5 feet/day): 64 cfs + Inflow (135 cfs) = 199 cfs
Report Generated November 17, 2025 08:41 am