New England District Corps of Engineers Projects May 13, 2025 06:22 AM |
Legend: | Pool >50% Full | Spillway Discharge (pool stage > spillway) |
Storage | Flow | Rainfall | Pool | |||||||||||
Project | Drain. Area ( mi2 ) |
Date/Time | Pool (ft) |
6 Hr Change (ft) |
24 Hr Pred. Stage (ft) |
% | Cap. Avail. per Drain. Area (in) |
Outflow (cfs) |
Inflow (cfs) |
24hr (in) |
48hr (in) |
7-Day (in) |
Normal | Spillway |
NAUGATUCK RIVER BASIN Basin Regulator: Laura Fraser |
||||||||||||||
Thomaston Dam | 97 | 13 MAY 05:30 am | 9.00 | -2.38 | 9.5 | 0 | 8.09 | 428 | 431 | .00 | .00 | 1.82 | 0 | 114 |
Black Rock Dam | 20 | 13 MAY 05:30 am | 27.53 | -.03 | 27.7 | 0 | 7.79 | 54 | 56 | .00 | .00 | 1.70 | 27 | 110 |
Hop Brook Dam | 16 | 13 MAY 06:15 am | 19.72 | -.03 | n/a | 1 | 7.75 | n/a | n/a | .00 | .00 | 1.69 | 18.5 | 72 |
Northfield Brook Dam | 6 | 13 MAY 05:30 am | 22.90 | -.02 | 22.9 | 0 | 7.67 | 18 | 18 | --- | --- | --- | 22.5 | 95.5 |
Hancock Brook Dam | 12 | 13 MAY 05:30 am | 7.89 | -.02 | 7.9 | 3 | 5.95 | 136 | 135 | --- | --- | --- | 7 | 30 |
East Branch Dam | 9 | 13 MAY 05:30 am | 1.32 | -.05 | 1.9 | 0 | 8.80 | 20 | 20 | --- | --- | --- | 0 | 67 |
Hall Meadow Dam | 17 | 13 MAY 05:30 am | 9.98 | -.02 | 9.9 | 4 | 9.05 | 20 | 18 | --- | --- | --- | 9 | 48 |
New England District Corps of Engineers River Gages May 13, 2025 06:20 AM |
Legend: | Warning Stage | Flood Stage |
Gage | Drainage Area ( mi2 ) |
Date/Time | Stage (ft) |
Q (cfs) |
6 Hour Change Stage (ft) |
6 Hour Change Flow (cfs) |
CSM Q/DA |
Warning Flow |
Warning Stage |
Flood Flow |
Flood Stage |
|||
NAUGATUCK RIVER BASIN Basin Regulator: Laura Fraser |
||||||||||||||
Naugatuck River @ Waterbury, Ct | 174 | 13 MAY 05:30 am | 8.16 | 730 | -.17 | -128 | 4.2 | 2190 | 10 | 5250 | 12.8 | |||
Naugatuck River @ Beacon Falls, Ct | 259 | 13 MAY 05:30 am | 3.77 | 1,224 | -.19 | -136 | 4.7 | 3990 | 7 | 9950 | 10.7 | |||
Housatonic River @ Stevenson, Ct | 1545 | 13 MAY 05:30 am | 8.97 | 8,104 | .51 | 579 | 5.2 | 13700 | 11 | 27200 | 15 |