New England District Corps of Engineers
Projects
June 16, 2024 08:49 PM
Legend: Pool >50% Full Spillway Discharge (pool stage > spillway)
  Storage Flow Rainfall Pool
Project Drain.
Area
( mi2 )
Date/Time Pool
(ft)
6 Hr Change
(ft)
24 Hr Pred.
Stage
(ft)
% Cap. Avail.
per Drain. Area
(in)
Outflow
(cfs)
Inflow
(cfs)
24hr
(in)
48hr
(in)
7-Day
(in)
Normal Spillway
NAUGATUCK RIVER BASIN
Basin Regulator: Laura Fraser
Thomaston Dam 97 16 JUN 08:30 pm 1.54 .02 1.7 0 8.10 40 40 .00 .00 .00 0 114
Black Rock Dam 20 16 JUN 08:30 pm 27.01 -.01 .0 0 7.80 2 2 .00 .03 .07 27 110
Hop Brook Dam 16 16 JUN 08:30 pm 19.21 .00 19.2 0 7.76 6 6 .00 .05 .22 18.5 72
Northfield Brook Dam 6 16 JUN 08:30 pm 22.37 -.07 .0 0 7.70 10 9 --- --- --- 22.5 95.5
Hancock Brook Dam 12 16 JUN 08:30 pm 7.20 -.01 7.1 1 6.01 46 44 --- --- --- 7 30
East Branch Dam 9 16 JUN 08:30 pm .77 -.09 2.8 0 8.80 12 13 --- --- --- 0 67
Hall Meadow Dam 17 16 JUN 08:30 pm 10.30 .00 10.3 4 9.03 25 25 --- --- --- 9 48


New England District Corps of Engineers
River Gages
June 16, 2024 08:49 PM
Legend: Warning Stage Flood Stage
Gage Drainage
Area
( mi2 )
Date/Time Stage
(ft)
Q
(cfs)
6 Hour
Change
Stage (ft)
6 Hour
Change
Flow (cfs)
CSM
Q/DA
Warning
Flow
Warning
Stage
Flood
Flow
Flood
Stage
NAUGATUCK RIVER BASIN
Basin Regulator: Laura Fraser
Naugatuck River @ Waterbury, Ct 174 16 JUN 08:30 pm 6.77 62 -.02 -4 .4 2190 10 5250 12.8
Naugatuck River @ Beacon Falls, Ct 259 16 JUN 08:30 pm 1.50 169 -.02 -5 .7 3990 7 9950 10.7
Housatonic River @ Stevenson, Ct 1545 16 JUN 08:30 pm 2.76 565 .26 95 .4 13700 11 27200 15