New England District Corps of Engineers
Projects
December 14, 2024 01:57 AM
Legend: Pool >50% Full Spillway Discharge (pool stage > spillway)
  Storage Flow Rainfall Pool
Project Drain.
Area
( mi2 )
Date/Time Pool
(ft)
6 Hr Change
(ft)
24 Hr Pred.
Stage
(ft)
% Cap. Avail.
per Drain. Area
(in)
Outflow
(cfs)
Inflow
(cfs)
24hr
(in)
48hr
(in)
7-Day
(in)
Normal Spillway
BLACKSTONE RIVER BASIN
Basin Regulator: Stephen Kissock, P.E.
West Hill Dam 28 14 DEC 01:30 am 3.11 -.13 2.3 1 8.27 58 39 .00 .01 3.03 2 30
Woonsocket Falls Dam 369 14 DEC 01:30 am 1.67 -.13 n/a n/a n/a n/a n/a .00 .00 2.28 ---


New England District Corps of Engineers
River Gages
December 14, 2024 01:57 AM
Legend: Warning Stage Flood Stage
Gage Drainage
Area
( mi2 )
Date/Time Stage
(ft)
Q
(cfs)
6 Hour
Change
Stage (ft)
6 Hour
Change
Flow (cfs)
CSM
Q/DA
Warning
Flow
Warning
Stage
Flood
Flow
Flood
Stage
BLACKSTONE RIVER BASIN
Basin Regulator: Stephen Kissock, P.E.
Blackstone River @ Millbury, Ma 71 14 DEC 01:30 am 2.22 136 -.09 -20 1.9 820 4 1970 6.5
Blackstone River @ Northbridge, Ma 139 14 DEC 01:30 am 4.00 n/a -.10 n/a n/a 1110 5.8 3100 9
Blackstone River @ Uxbridge, Ma 244 14 DEC 01:00 am 8.39 542 -.13 -45 2.2 2320 13 5660 17.5
Branch River @ Forestdale, Ri 91.2 14 DEC 01:15 am 2.82 138 -.11 -21 1.5 n/a n/a n/a n/a
Blackstone River @ Woonsocket, Ri 416 14 DEC 01:30 am 2.79 849 -.22 -120 2.0 4400 7 6670 9